top of page
11/12/2021
Repaired crosslevel in joint on staging 2830 and kink at Delaware end of 1210. Improved clearance on tunnel portal @ "Portal Jct." end of Otisville Tunnel. Installed roadbed and laid out industry tracks @ Lebanon. Decided on plan for industry tracks @ Eisbrod Foods so final section of roadbed on yard T1 installed. Replaced "missing link" at Somerton team/industrial lead. Installed roadbed for Atlantic Branch lead @ "Eastham Jct.".
bottom of page